Search scope:
排序: Display mode:
The Detonation and Resoluble Architecture of Conflict Management in Collaborative Environment
Wang Chonghai,Hao Yongping,Zhang Deyu
Strategic Study of CAE 2002, Volume 4, Issue 4, Pages 83-85
Keywords: CSCW conflict conflict management
Corrigendum to “High-Speed Railway Train Timetable Conflict Prediction Based on Fuzzy Temporal
He Zhuang, Liping Feng, Chao Wen, Qiyuan Peng, Qizhi Tang
Engineering 2017, Volume 3, Issue 1, Pages 150-150 doi: 10.1016/J.ENG.2017.01.002
Ground-to-Air Radar Jamming Syste——Functions in Current Local Conflict and Its Development Trend
Zhang Xixiang
Strategic Study of CAE 2000, Volume 2, Issue 7, Pages 55-65
This paper describes the development of the ground-to-air jammer. Initially this equipment can only jam the bomb-aiming radar, but now it has evolved into a ground-to-air jamming system or series, which can jam a variety of radars , including airborne radar on combat aircraft, missile guidance radar, precise guid-ance radar, AW ACS radar and sat ellite-borne radar, etc. The paper analyzes the jamming conception, methods and jamming station configuration against these types of radars.
The paper provides the conceptual analysis of the jamming suppression factors taken for jamming new types of radars, derives their mathematical expressions, and gives both the computer-simulated result and real-test result to further prove the confidence of the theoretical analysis.
The paper notes that in 2 current conflicts in 1990s, the intruders won the wars with very low loss rate (only several parts of ten thousands), because the other side had not equipped with the ground-to-air jamming systems. If they had got the ground-to-air jamming equipment deployed in their air defense system, they would have supported their air defense system to function well, reduced their own loss rate, increased the enemy´s loss, and made intruders not to win so easily.
The paper concludes that the ground-to-air jamming system plays a very important role in the national defense. It has both defensive and offensive functions with its 3D jamming capabilities. Also it is very, cost effective and quite suitable for the developing countries. The ground-to-air jamming system will have a bright future.
Keywords: ground-to-air jamming system functions in current conflict development trend
High-Speed Railway Train Timetable Conflict Prediction Based on Fuzzy Temporal Knowledge Reasoning
He Zhuang, Liping Feng, Chao Wen, Qiyuan Peng, Qizhi Tang
Engineering 2016, Volume 2, Issue 3, Pages 366-373 doi: 10.1016/J.ENG.2016.03.019
Keywords: High-speed railway Train timetable Conflict prediction Fuzzy temporal knowledge reasoning
An Empirical Study on the Generation Mechanism of NIMBY Conflicts of Construction Projects
Guang-she Jia,Song-yu Yan,Wen-jun Wang,Ralf Müller,Chen Lin
Frontiers of Engineering Management 2016, Volume 3, Issue 1, Pages 39-49 doi: 10.15302/J-FEM-2016015
Keywords: NIMBY conflicts social conflict construction projects mechanism empirical study
The Routine and Emergency Coordinated Management of Public Security
Ning Liu
Frontiers of Engineering Management 2015, Volume 2, Issue 4, Pages 331-338 doi: 10.15302/J-FEM-2015063
Keywords: public security routine management emergency management coordinated management
Inheritance and Innovation of Engineering Management Informatization
Kai Sun,Ren-huai Liu
Frontiers of Engineering Management 2014, Volume 1, Issue 1, Pages 76-82 doi: 10.15302/J-FEM-2014014
Keywords: engineering management informatization inter-organizational relationship management creation resource
Energy storage resources management: Planning, operation, and business model
Frontiers of Engineering Management Pages 373-391 doi: 10.1007/s42524-022-0194-4
Keywords: energy storage system energy storage resources management planning configuration operational management
Discussion on Problem-Based Engineering Management System
Qiao Xiang
Frontiers of Engineering Management 2015, Volume 2, Issue 3, Pages 249-260 doi: 10.15302/J-FEM-2015054
Keywords: problem engineering management system
Jian-ya Jiang,Yang-wei Rao
Frontiers of Engineering Management 2014, Volume 1, Issue 4, Pages 406-409 doi: 10.15302/J-FEM-2014049
Keywords: engineering management system education mode comparative research training improvement
Strengthening Project Management to Attain Overseas Blocks with High Potential for Exploration
Shu-lin Zhang
Frontiers of Engineering Management 2016, Volume 3, Issue 4, Pages 331-337 doi: 10.15302/J-FEM-2016058
Keywords: new overseas venture evaluation exploration project management quality management assessing system
Emergency strategies and trends in the management of liver trauma
Hongchi Jiang, Jizhou Wang
Frontiers of Medicine 2012, Volume 6, Issue 3, Pages 225-233 doi: 10.1007/s11684-012-0186-6
Keywords: liver trauma nonoperative management operative management
IT applications in land resources management: from content management to knowledge management
Guo Renzhong
Strategic Study of CAE 2009, Volume 11, Issue 10, Pages 67-71
Keywords: land resources IT pplication content management knowledge management
David A. Wyrick,Warren Myers
Frontiers of Engineering Management 2016, Volume 3, Issue 3, Pages 203-205 doi: 10.15302/J-FEM-2016046
Keywords: Grand Challenges urban infrastructure development engineering management system of systems strategicmanagement engineering management case study
Development of Engineering Management Education in China
Chuan-jun Zheng,Hu Cheng
Frontiers of Engineering Management 2015, Volume 2, Issue 3, Pages 304-310 doi: 10.15302/J-FEM-2015046
Keywords: engineering management education discipline development China
Title Author Date Type Operation
The Detonation and Resoluble Architecture of Conflict Management in Collaborative Environment
Wang Chonghai,Hao Yongping,Zhang Deyu
Journal Article
Corrigendum to “High-Speed Railway Train Timetable Conflict Prediction Based on Fuzzy Temporal
He Zhuang, Liping Feng, Chao Wen, Qiyuan Peng, Qizhi Tang
Journal Article
Ground-to-Air Radar Jamming Syste——Functions in Current Local Conflict and Its Development Trend
Zhang Xixiang
Journal Article
High-Speed Railway Train Timetable Conflict Prediction Based on Fuzzy Temporal Knowledge Reasoning
He Zhuang, Liping Feng, Chao Wen, Qiyuan Peng, Qizhi Tang
Journal Article
An Empirical Study on the Generation Mechanism of NIMBY Conflicts of Construction Projects
Guang-she Jia,Song-yu Yan,Wen-jun Wang,Ralf Müller,Chen Lin
Journal Article
Inheritance and Innovation of Engineering Management Informatization
Kai Sun,Ren-huai Liu
Journal Article
Revealing Engineering Management System and Education Model in Developed Countries for Engineering Management
Jian-ya Jiang,Yang-wei Rao
Journal Article
Strengthening Project Management to Attain Overseas Blocks with High Potential for Exploration
Shu-lin Zhang
Journal Article
Emergency strategies and trends in the management of liver trauma
Hongchi Jiang, Jizhou Wang
Journal Article
IT applications in land resources management: from content management to knowledge management
Guo Renzhong
Journal Article
Strategic Project Management to Use the Grand Challenge Scholars Program to Address Urban Infrastructure
David A. Wyrick,Warren Myers
Journal Article